CELLOPHANE BY OUR KNOTHOLE SUPERIN TENDENT RIGHT: Looking south from dry end be tween Casting Machines 3 and 4 prior to in stallation of steel floor grating. Note air inlet duct running overhead. iiwiwi ABOVE: Cellophane offices will be located in the two- story building on the left. Cafeteria is directly in front of the crane in center background. LEFT: Totem Pole brings on a contest between the var ious construction crafts involving the frequency of safety and housekeeping violations. Each craft tries to stay well above the "Low Man” position. 12