Page -3-
•The Commissioners incorporated these conditions into the resolution passed adding
the stipulation that before a permit is issued for the foundations, evidence of the
existence of a valid and enforceable construction contract for completion withir) a
reasonable time must be presented.
Mayor Hanan requested cooperation from residents in identifying any and all persons
within the Town who are disabled or incapacitated to the extent that special help is
needed [e.g. oxygen, wheelchair] in case evacuation is ordered. The County requests
this information so that proper plans can be made.
--------- oOo ---------
PLANNING BOARD MEETING - DECEMBER 15, 1986
Steve Foley, a member of Foley and Foley Marine Contractors, Inc. of New Bern,
presented an explanation on preventive maintenance of canal docks. He gave the Planning
Board members a copy of Fairfield Harbour's Property Control Committee Specifications on
Building Permits for refacing, replacement, new bulkheads, docks, piers, walkways,
outer pilings. Mr. Foley emphasised that when the concrete cap deterioates on a bulk
head, it must be removed. It must be replaced by treated lumber. He explained in
detail the procedure utilized in replacement of concrete caps. Mr. Foley showed photos
his company takes of bulkheads in need of repair. The present cost of the replacement
of bulkheads is $48. per running foot. His company gives a guarantee of 15 years.
Office of Foley & Foley Marine Contractors is located at 1902-A, Highway 70 East, New
Bern. Their telephone number is [919] 535-2515.
Mr. Millard Williams, Manager of Holiday Inn presented preliminary plans of the
proposed convention center for approval.
Mr. Bill Ballantine, Building Inspector explained Pine Knoll Village Shopping
Center's proposed height. This measurement is from the mean sea level.
The possibility of requiring completion of homes within one year's time was further
discussed with no determination made.
A list of items to cover for 1987 was made. There will be a workshop meeting with
the To\m Attorney at 9 a.m. the 4th Monday of January.
MARY I. KANYHA
--------- oOo ---------
COMMUNITY APPEARANCE COMMISSION MEETING - JANUARY 7, 1987
Jim Lancaster, a representative for the developers of Pine Knoll Village Shopping
Center, presented for approval a site plan of the first phase of buildings to be con
structed. After describing the plans, Mr. Lancaster assured the members that the land
scaping will be done in an attractive manner and any suggestions members had would be
given to the architect.
A discussion followed on approval of plans of a house which is to be moved from
the village of Salter Path to Willow Road. Plans furnished were inadequate.
Concern about the completion of a house on Loblolly Drive, that has been^ left
unfinished was brought to the attention of the commission.
Rachel Mangum volunteered to represent Pine Knoll Shores on Carteret County
Beautification Committee.
A workshop was mertioied for Community Appearance Commission members to be held in
lew Bern.